Le MN2

The second phase of a project for affordable condominiums in Montréal-Nord

Located at the gateway to the Montréal-Nord borough and completed in 2013, Le MN2 includes 64 condo units of one, two and three bedrooms on two levels. The project was completed within a year after the delivery of Phase 1. The six-storey building has architectural and functional characteristics similar to that of its parent project. The integration of small townhouses on two floors, each with a main entrance at street level, creates a living environment with a truly human scale.

See the Phase 1

Location

Exceptional accessibility to services and transport

The MN enjoys significant accessibility due to its close proximity to highways 40 and 25 as well as to the beautiful bike path along the Rivière-des-Prairies and bus lines leading to Langelier and Henri-Bourassa métro stations on the orange and green lines. The Maison culturelle et communautaire de Montréal-Nord features a dynamic cultural program and has one of the finest libraries in Montréal. In addition, the numerous shops and services nearby, including Cégep Marie-Victorin and Rivière-des-Prairies hospital are important assets for the co-owners of this project.

A project designed to engage the Montréal-Nord community

When the Le MN project was accredited, 80% of the households in the Montréal-Nord borough were tenants. This project certainly met a need of the community in terms of home ownership. The supply of affordable units generated by the program enabled households, who may have never aspired to homeownership, to engage in their living environment by developing a stronger sense of belonging to their neighbourhood.

Developer

Developer
Contact
  • Groupe Dargis450 682-1446

info@groupedargis.com https://www.groupedargis.com/en/

Architect

Architect
Contact
  • RUCCOLO + FAUBERT ARCHITECTES inc.514 527-1391

info@rfa-architectes.com https://www.rfa-architectes.com/

Looking for another project? Explore the map!